← All case studies

Case study

Industrial engineering, applied toFront-line supervision

UPS On Road Supervisor Tool: time standards in a supervisor's hand

Industrial-engineering time standards, put in a supervisor's hand: a handheld tool that timed drivers' delivery and safety methods and led to a US patent.

At a glance

  • Co-inventor, US Patent 7,571,111, also granted in Canada.
  • Prototypes taken into live operations.
  • A retraining tax credit application that earned UPS $3M in credits.

The problem

As Package Center of the Future Manager in UPS corporate industrial engineering, I designed and tested future-state roles, staffing, processes and technology for the Package Center of the Future. Part of the job was giving supervisors live feedback on drivers’ delivery and safety methods during ride-alongs and certifications.

Where the work happens

The methods being measured happened on the road, during ride-alongs and certifications. So the standard had to go there too, in the supervisor’s hand.

What I borrowed, and from where

Time standards from industrial engineering, put into a handheld application. I developed the vision and requirements for the On Road Supervisor Tool, which timed each driver’s delivery and safety methods against time allowances.

What changed

  • I selected the device and took prototypes into live operations.
  • Supervisors got live feedback on ride-alongs and certifications.
  • The work led to US Patent 7,571,111, “Computer System for Monitoring Actual Performance to Standards in Real Time” (2009), also granted in Canada (CA 2561595). I am a co-inventor.
  • I prepared the program’s application for Georgia’s Retraining Tax Credit, working with Corporate HR. It earned UPS $3M in credits.

Who made it work

It was teamwork inside UPS corporate industrial engineering. I am one of the patent’s co-inventors, and the tax credit application was prepared with Corporate HR.

What carries over today

A standard helps most when the people doing the work can see it while they work. I still put the measure where the work happens, and make the feedback immediate.

  • Telematics. At the first UPS telematics site, I wrote the requirements for the daily, weekly and monthly reports that UPS managers used in driver performance and safety reviews. Telematics is now standard across the UPS fleet.
  • New operational technology. As Technical Support Manager, Package Operation Support Group, I assessed and supported operational technology implementations, including Package Flow Technologies and smart labels.

Working on a process with too many handoffs and too much at stake?

Tell me what it is and where it goes wrong. A few lines are enough. Or email